QUOTE (gsxracer80 @ Jun 19 2004, 09:36 PM)
Is anyone from the DSMCentral Board gonna show up to this???? the date is June 27th at noon.... with any luck this will be the day that I officially un-veil the long over-due "project: Mutant GSX"
I may not be able to take the GSX unless I hit a few lucky streaks and get somewhere on my car.... so far nothing has gone right this week and everything takes three times as long as it should....
I need to get the starter installed, missing starter mounting bolts...
turbo oil feed line missing, you've heard the story on that already....
I need to get my front sway bar remounted, brackets wont line back up with new bushings....
I need to get wheel bearings back together, seals won't be here for two more days....
need to get cv shafts installed, mitsu ordered wrong trani output shaft seals, new won't be here till tomorrow....
front brakes need installed, can't do that with out wheel bearings finished....
interior needs to be put together, whats the point if it doesn't even run....
rear suspension needs done, can't even imagine time to do that in 4 days....
I knew that the turbo install went too smooth, something else woul have to hold me back... It's the dsm way
I need to find a place to hide where murphey's law doesn't apply